Showing posts with label shared space. Show all posts
Showing posts with label shared space. Show all posts

Thursday, 10 March 2016

Lower Clapton Road

Transport for London are consulting on changes to the Lower Clapton Road / Urswick Road junction in Hackney with the proposal to remove all traffic signals and replace the junction with an 'informal roundabout' and 'informal pedestrian crossings' along with some fancy paving. TFL state that the reason they are making these changes is due to a higher rate of collisions at this junction compared to similar roads, especially among pedestrians, and also due to congestion to motor traffic.

The proposed layout looks very similar to the recently redeveloped "shared space" Frideswide Square in Oxford, directly outside the main railway station. Despite the large amount of space available here the local council seem to have gone down the same route as Hackney Council have in recent schemes and created mammoth pavements with people cycling on the road having to do so in primary position, acting as a traffic calming measure on a narrow carriageway.

Frideswide Square in Oxford
I just happened to have a meeting in Oxford a few days after the square had officially reopened shortly before Christmas and spent a few minutes stood there observing the traffic. I'd asked the minicab driver to drop me off near the square rather than at the railway station itself for this very reason and asked him what he thought of the scheme. He claimed it was "wonderful" as before you could be stuck at the traffic lights for ages but now it was possible to drive straight through the junction without being delayed. He then proceeded to beep his horn at a cyclist using the informal roundabout right in front of us confirming my suspicions that travel time was higher on his agenda than road safety.

It was an early afternoon when I stood at Frideswide Square and I was not there for very long but it really did not impress me at all


Some traffic did slow down, however some cars and trucks blasted through at fairly high speed. Either way I found myself darting across the informal pedestrian crossings quicker than I would at a zebra crossing and it did not look like a comfortable place to be on the bike. Cycling through here is probably fine for many young adults who are willing to mix it with traffic on busy main roads either side of this square but this layout is totally unsuitable for the vast majority of the population and I would be surprised to see any young children or elderly people cycling here, at any time of the day.

"I’ve lost count of the number of times I’ve nearly knocked off somebody on a pushbike"
 As a rough guess I would say about 20% of the people cycling through the junction whilst I was there were using the pavement, rather than cycling on the carriageway

A lady cycling on the pavement, not wanting to informally cross this tankers path 
Two people cycling on the enormous pavement giving a good visual guide of exactly where segregated cycle tracks should have been built in Frideswide Square as part of this £6m redevelopment
I was intrigued by some of the quotes in this article on the Oxford Pedestrians Association's study of Frideswide Square. They found that whilst every single bus driver slowed down for pedestrians to cross the road only a third of drivers did with most driving straight past people waiting to cross, including a gentleman in a wheelchair. Even if traffic was very slow or stationary drivers would still block the pedestrian crossings rather than wait and allow people to cross. The group also witnessed three taxi drivers blasting their horns at cyclists in front of them on the roundabout, just as my own taxi driver did. This is something local councillor Colin Cook has also experienced whilst cycling here and so he thinks that "that there is still room for drivers to show more courtesy and respect for other road users". Or perhaps the council should have built zebra crossings and some cycle tracks in the vast space here, rather than a gigantic underused pavement and mixing bicycles with large motor vehicles on a narrow, busy carriageway?

I was only here for a few minutes so have not seen what this area is like during the rush hour and also haven't used the junction on a bicycle (and wouldn't particularly want to) but there are some strong similarities to the proposal at Lower Clapton Road.

One major difference between the Oxford scheme and the proposal in Clapton is that at Frideswide Square the carriageway has been reduced to one lane on approach to the junction but on Lower Clapton Road the proposal is to keep it to two lanes on two of the three entries to the roundabout


I have my reservations on vulnerable pedestrians using the informal crossings at Frideswide Square but here they are expected to use the informal crossings to cross over up to four lanes of traffic. It is almost exactly five years to the day since an elderly woman was killed at this junction after being run over twice on signalled crossings. I'm not sure how this scheme helps reduce injuries to vulnerable pedestrians, bar forcing them to cross the road somewhere else due to feeling too intimidated.

Having two lanes on approach to this junction southbound is seriously flawed as it means traffic travelling from Lower Clapton Road into Urswick Road will have little incentive to slow down, a potentially dangerous scenario for anyone cycling East to South across the junction. Although as I said on twitter the visualisation of children happily cycling through here side by side to get to school is preposterous
I wasn't quite sure why the mistake had been made in the other visualisations of someone cycling along the central reservation until I read that this was, astonishingly, part of the design.



"The flush central reservation strip on the north side would also allow cyclists to use the middle of the road if they so choose, something which they are currently doing."



Or perhaps people cycle along the centre of the road because the southbound carriageway of Lower Clapton Road is clogged up with motor traffic all day long wanting to turn right and this is the only way you'll get to the front of the queue on a bike

Lower Clapton Road, taken from Google maps street view
The junction under consultation is a very busy bus route with nine different bus services operating through it, including bus route 38 which is the most frequent bus service in London with 59 buses an hour at peak times (although around half of these services start and terminate at Hackney Central rather than at Clapton Pond, presumably due to the congestion at this very junction). I've had a look through the bus timetables of these nine services and a rough calculation concludes that on a weekday morning between 07:00 and 08:00 a total of 166 buses are scheduled to travel through this junction. Obviously that is a rough estimate and will change day to day based on road conditions in the area but 150-200 buses per hour or roughly three buses per minute sounds about right.

Live departures on a bus stop in one direction on Lower Clapton Road during this evenings rush hour
As for the total number of all motor vehicles using this route the Department for Transport traffic flow data reveals that over the five year period from 2010-2014 in excess of 12,000 motor vehicles travelled through this junction in an average 24 hour period, although that is down from the 16,000 from ten years earlier in the year 2000. In each of those five year traffic counts between 7 and 8% of vehicles travelling through this junction per day were bicycles, roughly in line with mode share of trips by bicycle in Hackney of 7%. Transport for London released the modelling results with this consultation which shows journey times being quickened up by 40 to 50% for "general traffic" through the junction post implementation of this scheme. This will surely only make the route more attractive to private motorists and help push the figures back up to millennial levels of 16,000 motor vehicles travelling through here in no time.

Despite the claims from TFL I see little benefit for people cycling or walking here at all. This scheme is all about increasing the amount of traffic using the junction whilst completely ignoring the needs of the 7% of people who currently cycle through here and the many more who might well like to but don't feel it is safe enough. The only people who would benefit are motorists and those who enjoy playing table tennis alongside main roads.

If TFL were serious about improving safety for pedestrians and people cycling they would instead propose something like this, safe cycle tracks and formal pedestrian crossings
This scheme is likely to be expensive to implement and expensive to maintain

The "Dutch Inspired" Shared Space Leonard Circus in Hackney now looking very sorry for itself after every single tree cage has been crashed into, all replaced within the last few weeks. Will the "Gateway Features" be replaced with the same design when they are crashed into or can we expect traffic cones instead?
An informal crossing in Poynton crumbling under the weight of thousands of motor vehicles using it per day (picture via Mark Treasure

A pedestrian crossing installed outside a nursery in Farringdon intended to reduce traffic speed. Now patched up and mostly replaced with tarmac after numerous daily visits from the lorries serving Smithfield Market and Crossrail

This consultation deadline has been extended and now closes on Sunday 20th March, please respond before then and ask TFL to instead provide a scheme which provides better conditions for people walking and cycling.

Thursday, 26 March 2015

Cycle Superhighway 1

In 2008 TFL first announced they planned to build cycle superhighways and the original map (below) shows that almost all of them were planned to be built on the main roads leading into and out of Greater London. This was following a 12-month study of the most popular roads already used by cyclists.


These were expensive routes despite just being some bright blue paint on the road which offered no protection whatsoever and had cars parked on top of them in many places. After several people died cycling along CS2 on the A11 TFL are now upgrading most of the superhighways that have already been built and making the majority of the routes properly segregated.

Despite the original study showing the A10 is a popular cycle route and therefore where the superhighway should run TFL, under pressure from Hackney Council, relented and agreed to build it on back routes instead. This is despite Hackney council stating in the recent cycling plan that:

"Creating a quality environment for cycling is generally recognised as being concerned with providing accessible, direct and convenient, attractive, safe and comfortable routes for experienced and less experienced cyclists alike to provide access to key destinations such as the borough’s town centres and other key destinations for employment, education and leisure.  Cycling routes need to legible and intuitive, continuous and uninterrupted by barriers or loss of priority.It is inevitable that cyclists will continue to use our busy high streets and strategic roads that carry high volumes of vehicular traffic because often they are the most direct and quickest routes."

As well as being a very popular cycle route the A10 is also the worst road by far for cycling casualties within Hackney with 28% of all serious injuries sustained in a cycling collision in the last ten years occurring on the A10 and 50% of all cycling fatalties also occurring on the A10 within this period. Hackney council stated in their cycling plan that they "will continue to lobby TfL and work with them to resolve the cyclist accident problems along the A10 corridor in Hackney" but the way they plan to do this is take people off a useful, direct main road and push them onto back roads instead, something which is itself a major barrier to mainstream cycling. It also means that the proposed route is not actually a "superhighway" at all, at least according to the Mayor's vision for cycling:

"We will offer two clear kinds of branded route: high capacity Superhighways, mostly on main roads, for fast commuters, and slightly slower but still direct Quietways on pleasant, low-traffic side streets for those wanting a more relaxed journey." 

Therefore CS1 should instead be referred to as a quietway as, certainly on the section within Hackney, it runs almost entirely on side streets and not on the main roads. It also isn't a new cycle route either but instead  improvements to the existing parallel LCN+ route. TFL dress it up in the consultation by describing it as an "A10 bypass" forgetting to point out that this also bypasses the town centres, shops, homes and businesses that people need to access in the area. TFL would never propose to amend the bus services from Central London to Tottenham to run along side roads for the simple reason that unless you live on these back roads you generally won't want to visit them. Likewise Hackney Council are not intending to make the pavements along the A10 narrower to try and force pedestrians to use back roads in an attempt to stop them being exposed to pollution or whatever other excuse they're drumming up for moving CS1 off the A10.

Despite the fact that CS1 should run in its entirety along the A10 this, mistakenly, is not an option out for consultation by TFL. Therefore I shall review the consultation for the section of CS1 which is proposed to run through Hackney.

Section 1


It starts off with a sign which highlights this is the start of CS1, which is just as well as without that it would just look like any other car dominated street. It continues north  with car parking remaining on both sides of the road. The cycle lane into Finsbury Square, which is actually part of the ring of steel, needs widening. The route should take priority over Worship Street.


Section 2


The very poor contraflow cycle lane remains and continues to run outside of the parking spaces so cars need to cross the cycle lane to park with the threat of 'dooring' remaining. A lot of car parking remains although this is restricted between 7am-9am and 4pm-7pm which doesn't help people like me as I tend to cycle to work after 9am. Also people park on double yellow lines here all the time (forcing cars to drive into the contraflow cycle lane) as there is no enforcement so I can't see the new parking times being enforced either 





Leonard Circus could be a nice public space but it is dominated by motor vehicles. Some do slow down and move through quietly whilst others speed through the area, indeed one of the fences around the trees has had to be replaced already as a vehicle crashed into it at high speed. A lot of lorries and vans travel through here as it's a very busy rat run, especially for people trying to avoid the Old Street Roundabout - only expect this to get worse when works start on improving the roundabout. Many of the streets in the area here bounded by Great Eastern Street / City Road / London Wall / Bishopsgate need filtering.


Section 3


The road that links Tabernacle Street to Paul Street is to be turned into "shared space for motor vehicles, cyclists and pedestrians". Sounds lovely.





This should be closed to motor vehicles and returned to a motor free Square. There should be a clearly marked cycle path from both Tabernacle Street and Paul Street to the crossing at Apex Corner, ideally a different colour from the rest of the street surface and at a different level, even by an inch or so to avoid any cycle / pedestrian collisions. The planned 7-9am and 4-7pm restrictions on parking will be probably be as enforced as the double yellow lines in front of the current cycle track entrance are at the moment


Section 4



The artists impressions of the plans above for Apex Junction is what TFL use first in the various press releases about this scheme for a good reason - this is where it actually looks like a proper cycle route!  
I strongly welcome the closing of Pitfield street although worth noting that traffic that can't currently access Pitfield Street from Old Street westbound mostly uses Boot Street and therefore both Boot Street and Coronet Street should also be filtered to stop this from happening.
I like the segregated track eastbound on Old Street approaching Pitfield Street and it is great to finally see the mistakes that were made of providing no cycle tracks when the Shoreditch one way system was returned to two way in 2002 are now being corrected. I'm pleased the large amount of cyclists travelling from the Old Street Roundabout towards Hackney Road or the A10 now get some dedicated space but disapointed to see nothing for people cycling westbound towards the Old Street Roundabout. Brian Jones came up with a decent rough sketch so I'm sure TFLs engneers can do better. The Loading bay on the eastbound carriageway should be outside the cycle lane, ideally with a "loading bay bypass".


Section 5 


Pitfield Street is to be restored for two way traffic but I can't see how that is an improvement for people cycling at all. Simply turning a one way street into two way does not automatically make it an improvement for people cycling and I've never understood why the Hackney cycling campaign say that they want ALL roads in Hackney to be returned to two way. Keeping roads one way for motor vehicles can help to reduce the amount of motor traffic in the area whilst leaving more room for cycling infrastructure. Mark Treasure has covered this in a very good blog post and the image below is just one example that we could use to base similar treatment of Pitfield Street on.




The side roads along here get "raised tables" and below is an example of a side road off Queensbridge Road that has recently been upgraded by Hackney Council



Whilst this is a definite improvement it is still designed to appear that the pedestrian gives way to the car so I  would much prefer continuous pavements on these side roads instead.


A recent example of this in London, via The Ranty Highwayman
A Dutch example, via The Cycling Embassy of Great Britain

Section 6


Well this is just insane. The entire area below is to be ripped up, turned into two way for all vehicles yet to be rebuilt as a narrow road with no space whatsoever for people cycling; you're just expected to man up and take the lane 



How is this in any way a proposed cycle superhighway when with such a large amount of space available to reallocate and don't give an inch of it to people cycling? Expect motor vehicles to continue with close passes as the car is doing in the picture below


Whilst the removal of the roundabout will make cycling through here a lot safer keeping roads such as Bevenden Street and Fanshaw Street open is only going to either keep traffic levels high in this area or perhaps even increase them, due to making Pitfield Street two way.

Section 7


This section of Pitfield Street and Whitmore Road is currently an unpleasant road to cycle along and it is such a disappointment to see hardly any measures whatsoever to change this. Motor traffic, and white vans in particular, dominate this street and race through it at high speeds; this is a road where we should be concentrating our efforts on getting enforcement of the current 30mph speed limit before pushing for 20mph. 


Is it any wonder only 2% of children cycle to school in Hackney when you look at the picture above, this is cycle superhighway 1 right outside St John the Baptist primary school (where nearly 10% of children arrive at school by car). There are no plans for this stretch of road in the consultation beyond resurfacing. 


This whole area needs a lot of road closures, not just on Pitfield Street but also on the side roads so it can no longer be used as a through route between New North Road, Hoxton Street and the A10. This also includes the re-routing of bus route 394; you can't promote a road as a "cycle superhighway" run it along back streets and then continue to run bus services along these back routes and keep them open to the large amount of rat running traffic that already uses it. It is ludicrous.




Just look at the amount of space available below as it turns into Whitmore Road yet the consultation here calls for nothing more than "carriageway resurfacing, "cycling wayfinding" and "speed bumps rebuilt with smoother shape" with not an inch of car parking removed as far as the eye can see, and way beyond



This is about as far from 8 to 80 cycling as you can get, and keeps cycling in Hackney firmly in the 18 to 38 category. Absolutely no chance of children or the elderly cycling here in comfort and safety and not a place where it is, to quote from the Hackney Council Cycling plan, "second nature for everyone, no matter what their age, background or ethnicity to cycle"

As I took these pictures the bully in the van below revved his engine and beeped his horn as he overtook two people cycling obscured from view.



A horrendous place to ride a bike and the type of road which makes people give up cycling once they get to a certain age, or after a certain number of close passes. It is nothing short of a scandal that no dedicated cycling provision or removal of motor traffic is being offered here, on what is meant to be a "cycling superhighway"

As we cross the Regents Canal over the Georgian Whitmore Bridge the road narrows so you have to take the lane. An option of painted cycle lanes on either side of the road with cars giving way to each other through the centre would be a good addition here



Meanwhile the next bridge along on the canal, the Georgian Kingsland Road Bridge which carries the A10 over the canal also narrows meaning no room for bus lanes. Even though this fails the Hackney test it does just mean the bus lanes stop for a short section but then continue immediately after, rather than using that as an excuse to not build any bus lanes on the A10 whatsoever



As Whitmore Road turns into De Beauvoir Road it continues to be dominated by car parking along both sides of the carriageway and is an unpleasant place to cycle. It also doesn't feel like the safest place to be after dark so best follow the advice of the Hackney cycling campaign here as "busy main roads are the safest bet for personal security after dark". The A10 runs parallel to the cycle superhighway here so just a short diversion is needed after 4pm in the winter, it is just a shame that the A10 is narrow here so just does not have the space for cycle tracks



Section 8


As we turn into Northchurch Terrace we're round the corner from my old flat. I've written about De Beauvoir town and how much I like it before so I won't repeat myself again. Interesting to note there is some 'filtered permeability' here on Northchurch Terrace (installed 40 years ago), the first road closure we've encountered on the superhighway since at Old Street, over a mile away. Culford Road should take priority over Englefield Road as this could cause a lengthy delay for people cycling the route at peak times; Englefield Road is not a quiet road by any stretch of the imagination. The closure of Ardleigh Road outside my old local is a positive proposal however as it is a busy road for rat runners and with no closures planned for Culford Road I worry that this will just push even more motor traffic onto the cycle superhighway. Another four way closure should happen at the crossroads just north of the Scolts Head but the only improvement at where I took the photo below is to remove the traffic island I'm stood on and extend car parking on both sides of the road




Section 9



Balls Pond Road is a busy road used by approximately 100 buses an hour at peak times (including bus route 38 which is London's busiest bus route by frequency with 35 buses heading this way from 7am to 8am on weekdays), as well as many other motor vehicles and is clearly no place for someone to share the road whilst on a bike. It is three lanes wide with one of these lanes an eastbound bus lane, TFL state that 90% of buses do not use it; not a single vehicle bar bicycles used it for the ten minutes I was stood here.  



It therefore makes sense for this space to be reallocated to bikes instead. Option A offers no protection whatsover and therefore Option B should be installed but with a feeder lane for people already cycling eastbound to access the cycle track at the crossing instead of the enlarged pavement.


Section 10


Boleyn road is far too busy to be used as a cycle route unless you install cycle tracks on it or close it to through motor traffic. I used to use this road a lot when I lived in Dalston to travel towards Newington Green and it is a busy road, there is easily space here to add provision for people cycling




Section 11


Wordsworth road is a busy rat run and whilst the closure of the southern end of the road may help reduce this, traffic can still use it as a through route from the A10. Therefore Bennett Road should also be closed to ensure this can no longer be used as a through route. The roundabout should also be removed



Nevill road is far too busy to be classed as a cycle route and needs many road closures due to the high volume of motor traffic using this as a through route




Section 12


Defoe Road and Nevill Road are lined with cars on both sides of the carriageway so there is only just enough room for a car and cycle to pass with little room for error.




This might be adequate if both streets had several closures to ensure they could only ever be used by residents of the properties here but as these streets are currently used as through routes for traffic I fear the road will only be used by the type of people who already cycle in Hackney. We need to make roads like this feel safe for people of all ages if we want to see an increase in cycling



Stoke Newington Church Street is a very busy street carrying a lot of fast motor traffic, including about 70 buses an hour at peak times with several cycle KSI collisions occurring here in recent years. The road is wide enough for cycle tracks and these are needed, just as they are on Balls Pond Road


Without them people will either continue to cycle along the pavement here or not cycle at all


Section 13 onwards


More of the same really, car lined residential streets mixed with main roads with no proposals for cycle infrastructure



None of these roads should be in the consultation as he A10 is more than wide enough north of Stoke Newington station for cycle tracks



The A10 before it became one way in the 1970s via @HistoryOfStokey
So that's the "not very super highway that has very little cycling provision 1". In a way it is almost a shame that TFL didn't stick some blue paint down on the A10 a few years ago as we now might be getting money spent on upgrading cycling facilities on the A10, just as they are currently doing along the A11 in Tower Hamlets.

CS1 might be a decent cycle route for you if you live on or just off the route, you've generally confident cycling among motor traffic and want a route from somewhere like Stoke Newington Church Street to De Beauvoir Town (as long as it is before nightfall). However it does nothing whatsoever for people who live and work to the east of the A10, such as in Haggerston or Clapton. Likewise if you're a driver then you shouldn't be inconvenienced too much as you can still access the vast majority of it and I'm sure the clever cabbie will still be recommending people to use the majority of route, as he or she already does with other sections of LCN+.

There should really be no need to have this consultation; improvements such as the closures of Pitfield Street and Wordsworth Street should be standard highway improvements that local councils carry out continually. Large investments and lengthy consultations should consist of schemes such as the East-West Superhighway; High Quality cycle tracks on main roads. Any other city in the world planning CS1 would reallocate space on the A10 for it; either do it properly or not at all.

Hackney Council needs to stop ignoring the main roads and move away from using the hierarchy of provision on all of the boroughs roads. Reducing the impact of motor traffic on the back roads is always welcome and Hackney Council can be applauded for some of their schemes to close roads to through motor traffic, although there is nowhere near enough of it in this consultation for my liking. However lorries, buses, vans and cars all need to use the main roads in the borough to access shops, business and homes just as people on bikes do. Hackney  Council and TFL need to allocate proper protected space for people cycling here (which does not mean 4.5m wide roads, such as in Dalston Kingsland). The reason CS1 is no longer planned to run down the A10 is due to a political decision, not one based on technical reasons. In the last ten years 65% of all serious injuries and 80% of deaths in cycle collisions within Hackney happened on the main roads and these are the roads that need to be improved to make them safe for cycling for all. The Council themselves even committed to this in the 2014-2024 cycling plan:

The Council recognises that cyclists use a combination of routes depending upon their levels of confidence and the fact that is often difficult to avoid busier principal roads to reach your destination. Busier principal roads with heavier traffic flows also tend to be faster and more direct than quieter routes and are often used by more confident commuter cyclists.   The previous chapter established that the majority of cyclist accidents in the borough occur on the busier principal roads. Therefore in addition to completing our network of Quietway routes on quieter roads that are ideal for less confident cyclists we will also look to develop and improve conditions for cyclists on our principal routes.

The A10 is a busy route for all types of motor traffic but that is because it is a place where people live, work and want to visit and is the most direct route both connecting and leading directly through the centre of Tottenham, Stamford Hill, Stoke Newington, Dalston, Haggerston, Hoxton, Shoreditch and the City. This is the same reason that the A10 is a popular cycle routeThe one thing we don't need is even more buses ploughing down the A10, we need a reduction in bus journeys and active travel promoted as a safe and serious alternative. Improvements to back roads and filtered permeability are great improvements for the local community as a whole and are vital if we want people to cycle from their homes to their school or place of work. Improvements such as this are needed throughout London but only if it is in addition to clear, safe and direct cycle routes on the main roads so people can ride wherever they like, just as they do in the Netherlands. If Hackney is to continue to deliver cycling improvements yet none of these include clear protected space on the main roads then I fear the 93% will stick to using alternative methods of transport and roads such as the A10 will continue to be the biggest graveyards for people on bikes in Hackney. 

The CS1 consultation is open until Sunday 29th March. Please respond here.