Monday, 14 January 2019

The Greenway is now Quietway 22

The Greenway is a footpath and cycleway running for nearly five miles from Old Ford to Beckton, located on top of the Northern Outfall Sewer, which was built in the mid to late 1800's. Recently this five mile stretch has been renamed "Quietway 22", at a cost of £4.5m, and I suspect that TfL are declaring this upgrade as part of their "we've doubled the amount of protected space delivered under the previous mayor" claim.Whilst that would be a very dishonest thing for them to do there have been some improvements to the Greenway recently as part of the re-branding.

I first cycled on the Greenway back in 2003 when the section from Old ford, which currently cuts through the Olympic Park, went through the Marshgate Lane industrial estate instead. Back then this section was just a narrow shared path, in a pretty poor condition and littered with burnt out mopeds. Fast forward a few years and construction of the Olympic Park began, with the Greenway freshly resurfaced as it was used as a route for construction workers to access the park via Pudding Mill Lane DLR station, as well as a destination for people to view construction of the park, with a cafe built out of shipping containers opening in late 2009. During the Olympic Games there were plans for the Greenway to form two of the entrances for spectators to the games; for those on bike coming from Victoria Park and also for people coming via underground from West Ham station. Therefore in preparation the entire stretch from Old Ford to West Ham was upgraded prior to the Olympics, with separate paths for those on foot and on bike


As part of Quietway 22 lightning and CCTV has recently been installed to allow this route to be used 24 hours a day


The Greenway is dissected as the Great Eastern Railway and DLR lines cross it, this used to require a short diversion down to Marshgate Lane, before rejoining the Greenway immediately after the railway bridge

Marshgate Lane at the bottom of the Greenway in 2007
Marshgate Lane at the bottom of the Greenway in 2019

However this section of the Greenway, from Marshgate Lane to Stratford High Street, has been closed since 2009; initially for Olympic Park construction works, Crossrail then kept it closed and now Thames Water have taken over, meaning this stretch will soon notch up a decade of being closed, with no reopening date in sight. A new ramp was built several years ago from Marshgate Lane to the Greenway but remains fenced off


Prior to the closure of this section of the Greenway there was another barrier at Stratford High Street, literally barriers in the middle of a six lane road, meaning you had to cycle on the shared use pavement to Abbey Road to use the staggered crossing and return on the pavement on the other side of the road. The Olympic transport planners really wanted spectators to travel via West Ham and walk to the park along the Greenway, rather than use the Central or Jubilee line and risk overcrowding at Stratford. Therefore the West Ham route was heavily publicised, with the green sections of the greenway completely covered in asphalt and a new footbridge installed over Stratford High Street (visible on Streetview here) as well as a brand new direct pedestrian crossing underneath for those in wheelchairs or other mobility problems. A real shame then that the footbridge and direct crossing were only there for a few weeks of games time. The bridge was moved to the former coach park alongside for a few months before being dismantled and the direct crossing was reconfigured as a staggered crossing. Whilst a crossing does now exist for when the Greenway reopens at Stratford High Street, it'll take quite a bit longer to cross than it did during the games

I feel it is a missed opportunity that the bridge here was not constructed as a permanent walking and cycling bridge, as has been achieved over Eastway, between Hackney Marshes and the northern section of the Olympic Park. On the bright side Stratford High Street does now have protected cycle tracks on it, constructed in 2013, extended to Aldgate in 2016 and currently being extended into the centre of Stratford 

The (rather narrow) separate cycling and walking paths continue to West Ham station, with green mostly restored



Shortly before West Ham station the steps at Abbey Road have been replaced with a ramp



Leading to a new toucan crossing which links up with a resurfaced Channelsea path, on top of the culverted Channelsea River, which (almost) links up with Stratford High Street



Back on the Greenway and the separate cycling and walking paths stop as soon as you pass the steps and long ramp to West Ham station and the Greenway looks very much the same as it did when I first cycled here over 15 years ago, except with lightning added and the odd "Q22" sign added to the light columns


And a new ramp down to the path through rugby pitches and the Plaistow memorial recreation ground



We then come to Upper Road where a toucan crossing greets us, after negotiating the various barriers designed to keep motor vehicles out



Most people don't bother to push the button and wait for the green man, instead opting to cross this not-very-busy road unassisted. It isn't a main road so a disappointment that as part of the quietway upgrade a tiger crossing wasn't installed, giving pedestrians and cyclist priority over motor vehicles.

A tiger crossing on the much busier Lower Clapton Road in Hackney, as part of Quietway 2
500m later we cross Balaam Street, where barriers force you to cycle a short distance along the pavement to reach the crossing, which is very mush favoured towards motor traffic on the road rather the pedestrians and cyclists on the greenway, so a lengthy wait can ensue



A helpful local resident has felt the need to install warnings that you might well be mugged at knifepoint here, a reminder that quietways are not always the best solution and why protected cycle tracks are required on main roads nearby also.



200m later we have to cross Barking Road, quite a busy road, again requiring you to cycle a short distance on the pavement to reach the crossing


and less than 200m on we have to cross Prince Regent Lane, our 4th signalled crossing in less than a kilometre


The route does then continue for the next 2km to the A13 junction at Beckton, where it meets Cycle Superhighway 3, obstruction free, except for one road crossing on a bus only route to Newham General Hospital, so a very quiet road but I still think priority should be given to the Greenway here, rather than the road.



Another new ramp has been constructed down to Lonsdale Avenue 

The new ramp under construction in the summer of 2018, now complete
Queitway 22 ends at the A13 Beckton Junction (although the Greenway continues onto Beckton sewage works) so connects up with Cycle Superhighway 3, which runs alongside the A13. This can take you to Barking heading east and to Canning Town if going west (or even as far as Paddington if you're willing to mix it with traffic on Poplar High Street). Unfortunately it'll take you some time to reach it as you have to stop and wait at seven different shared crossings to get to the other side of the road


The ideal solution here would be a walking and cycling underpass linking the Greenway and CS3 under the A13 and also under Woolwich Manor Way, which would improve conditions for those on CS3 as well. An expensive solution but one that would be a routine upgrade for a junction like this in the Netherlands

Quietway 22 has brought a few small improvements to the Greenway, especially the lightning. However the lack of priority over roads and shared pavement facilities at Beckton and on Wick Lane at either end are a disappointment.

A safe, convenient traffic free walking and cycling route? Yes, the Greenway has been that for decades.

An increase under the Khan administration of the amount of protected space for cyclists, comparable to major road transformation projects such as those on Embankment, Whitechapel Road or Vauxhall Bridge under Boris Johnson? Absolutely not.




Thursday, 7 December 2017

The Olympic Park in 2017, Part Four: Sweetwater and Fish Island

Sweetwater is the next stage of the park to be built, located in the borough of Tower Hamlets it will house 650 homes, a primary school, two nurseries, a health centre and a library. Sorry, I mean an idea store. During the games this area was where the worlds largest McDonald's was briefly located, along with the London 2012 Megastore. Prior to 2007 it housed the Bow Industrial Estate and Carpenters Business Park. To the west of Sweetwater, on the other side of the River Lee Navigation, lies Fish Island, not officially part of the Olympic Park but undergoing a huge amount of building works right now and under the jurisdiction of London Legacy Development Corporation planning department.


The only current way to enter this side of this area of the park by motor vehicle is via White Post Lane, which used to begin at Victoria Park, but now begins on the other side of the A12 with the first section due to form part of quietway 6. Most of it runs along construction sites at present but as it reaches the Olympic Park it runs past the former six storey Clarnico's chocolate factory (now mother studios) and the two storey white building, originally built to roast imported cocoa beans arriving via boat (hence the name Sweetwater), and now the White Building and always popular Crate Brewery and Pizzaria. This road was closed from 2007 through to 2013 and as a local I got used to the pleasant silence of the area and so it was quite a surprise when it originally reopened to motor traffic but four years on I've grown used to it once again




Crossing over the narrow Victorian bridge into the park and the road becomes Carpenter's Road, which used to be much narrower than it is today before Olympic Park construction began.

Carpenter's Road at the junction with Waterden Road in 2007, via Diamond Geezer on flickr
The same junction in 2017, with this section of Waterden Road now renamed Clarnico Lane


From the other side, Carpenter's Road at Waterden Road in 2007 via Sludge G on Flickr
The same junction in 2017, with the bridge and former Clarnico's factory in the distance the only remaining features. The road has been significantly widened 

Zooming out from the image above gives you a clearer view of just how wide the road is, yet despite the post Olympics widened layout the only facilities for people cycling are narrow, intermittent cycle lanes, which give up at every bus stop and junction



The road continues sandwiched between the North London line and what will become Stratford Waterfront in the future but was a beach when I took the photo below this summer. Prior to that it was the Water Polo Arena in 2012 and fridge mountain before Olympic Park construction began

You may just be able to make out the two cyclists in the photo on the footpath, shortly after the wide exit from the Aquatics Centre car park and what must be the least used zebra crossing in London
Carpenters Road continues past my local swimming pool

Again, can you spot the cyclist on the footpath in the bottom left?
This junction is gigantic, yet only narrow cycle lanes are all that is provided. This T junction existing prior to the Olympics

The same junction from google earth in 2005 and today, captured via google earth. It was a T junction but much smaller and located slightly further south 
The junction of Carpenters Road and Warton Road before the Olympics (©2004 Peter Marshall mylondondiary.co.uk) and the same location, renamed Swimmers Lane in 2017

Carpenters Road still continues under the railway bridge, as it did before the Olympics, but by making a left turn. The road continuing straight on becomes "loop Road" so called because it, along with Carpenters Road, loops all around the southern half of the park. Once under the railway bridge it passes through Carpenters estate, which Newham Council would really like to demolish to sell off to property developers, and onto Stratford High Street and the segregated cycle tracks of CS2

Back in Sweetwater it is clear to see how much space this cyclist has on the pavement, compared to the narrow intermittent cycle lanes on the road

Clearly no space to provide protected cycle infrastructure here!
This is exactly what I do when I take my daughter to her swimming lessons by bike every week, as I just don't feel it is safe enough on the road, risking mixing it with left turning lorries and cars travelling at high speed on this wide, straight road and in my experience, most people here tend to use the pavement


Probably for the same reasons, parents are naturally protective of their children and want to keep them away from danger


Also all the attractions, such as the Aquatics Centre and Westfield, are located south of this road and sometimes there just is no dropped kerb to allow you to hop off the pavement to get onto the road


There are usually very few pedestrians along here so this isn't an issue at present, however once Sweetwater is built then residential properties and the library will be located along this road and so it'll become a busy pavement. There is clearly enough room for cycle tracks either side or a bi-directional cycle track along here; if located north of the road then it would run between the road and the railway track, and with Clarnico Lane also due to be removed soon it would have no side road conflict, just as CS3 doesn't along the Embankment. However it would be on the wrong side of the road to all the properties and amenities, so ideally should be placed along the south side of the road instead. As construction has not started on Sweetwater yet and so there is still the time and space to build it,  the bridge is also very wide so it can easily be accommodated.


Do they seriously expect parents to cycle with their children to the library, nursery or primary school on Carpenters Road as it is, with those narrow cycle lanes?

Once you pass under the White Post Lane bridge along the Lee Canal Towpath the new canal park appears.


It is very pleasant but once again I do wish some of the space could have been used for a wider path

The towpath when I cycled this route back in 2007, with the Bow Industrial Estate boarded up but not yet demolished, and the same location today
Or at least a simple diversion onto a cycle track alongside the road along here but this was reconstructed in 2014, with no dedicated space for cycling, just a narrow road and a gigantic pavement

During the Olympics and three years later
As I reported in this blog earlier this year, this road has a realigned extension built just under a year ago and despite the space available, narrow advisory cycle lanes were painted onto the road, which is so narrow cars have no option but to drive in them




Bobby Moore Academy opened it doors to local school children in September. This site next to Sweetwater will be a primary school, however at present the secondary school is still under construction a short distance  away on the loop road on the other side of the stadium and so year 7 pupils are currently housed here until they transfer next year and reception children take over. I cycled this way one day at 3.30pm in the first few weeks of it opening and was not at all surprised that the mammoth pavement was being used to park cars on the school run





Just imagine how busy this road will be at 3.30pm in a few years when the full number of 400 pupils are based here, along with another 1000 around the corner in the secondary school!

Before and after. Why paint  narrow cycle lanes on such a narrow road with all this space available?
As the loop road continues round the edge of the stadium it passes over a new bridge over the River Lea, constructed during 2009/2010 and then loops around the stadium

The loop road in 2012, taken from google street view, when it was part of the service road used by athletes and the media during the games and the same spot today. Plenty of space to provide protected cycle tracks that the pupils from both the primary and secondary school located on this road could use to get to and from school
Whilst the road is currently closed outside the secondary school, as it forms part of the construction site, it is now possible to travel from Hackney Wick directly to Stratford High Street via this route, something that was not possible before this became the Olympic Park. These roads will get much busier over time

The north side of Fish Island was traditionally a place where people lived in Victorian Houses and worked in the various factories, such as Clarnico, or in the warehouses along the rivers and canals in the area up until the 1970s when they were demolished for more modern industrial units. Many of those industrial units have recently been demolished to once again house people and so a large area of it is currently a building site

The north side of Fish Island, a year apart
A lot of the old warehouses remain on the South side of Fish Island, mostly housing artists studios but with some well known businesses, such as Trumans Brewery, Formans smoked salmon and the Morning Star newspaper all based here in newer buildings.

The former Wick Lane Rubber Works, built in 1889, now housing artist studios 
At the end of Monier Road, the main road through the middle of Fish Island, a new apartment block, Carpenters Wharf, nears completion.


You can still travel back in time on google streetview to see the Carlton Cafe and warehouse as it was before demolition but in the present day the chimney with "Carlton" painted on it is the only reminder of it (although named after the shoe company who were once based here). Fish Island remains a quiet place to walk or cycle as it is naturally filtered by water or sewers. All motor traffic in the area is there for a reason, not using it as a through route to somewhere else. Unfortunately the London Legacy Development Corporation still want to tear down the popular walking and cycling bridge over the Lee Navigation. After I wrote about this plan on here last year I wrote to Caroline Russell and she kindly asked the Mayor about this bridge, and this was his response:

"The H14 all modes bridge is anticipated to have a speed limit of 20mph and has a narrow road width. It is unlikely that there will be an issue of rat running, as this connection would not provide any journey time savings or represent an obvious short cut for anyone using the existing strategic road network.
These bridges are part of the regeneration strategy for the area which is designed to rectify some of the long standing problems of isolation, caused by the large numbers of waterways and major trunk roads which have had a long term debilitating effect on the immediate local economy. I am informed that the construction of these bridges will help ensure that the Hackney Wick and Fish Island communities will have access to the world class facilities of QEOP, including the new schools, thousands of new homes, healthcare centres and other amenities. This will be a significant economic and social benefit for local residents."

Firstly, most roads in the Olympic Park are 20mph but speeding remains a real issue on many of its roads. Also you can tell Sadiq does not cycle and narrow main roads are terrible for cycling!


Next year if this child wants to cycle here then he'll have to do so in the centre of a narrow road to slow down speeding lorries

As for it to be unlikely that rat running will be an issue here, that is quite clearly not true

The new road and bridge running from left to right at the bottom of the map. It'll connect directly to the Loop Road, which in turn connects directly to Waterden Road to the north and Stratford High Street to the south. 
The mayor has been incorrectly informed that this bridge will help ensure that the local communities have access to the world class facilities of the park, schools and other facilities on the other side of the water as they will already have that due to the walking and cycling bridge that already exists! It is well connected already, unless you're a driver looking for a rat run. For those small number of residents that need to drive to those facilities then they are perfectly able to by using an existing bridge 250m away


If the Mayor is serious about tackling air pollution then why on earth would he back the building of this road?

Fish Island is an area where everyone can access all roads by car but there is no through traffic. I find it astonishing that as locals councils such as Hackney and Waltham Forest meet opposition to try and filter residential roads we have a community that already has filtered roads and the plan is to undo that. What Hackney Wick and the surrounding area needs is more pedestrian and friendly routes, not more cars. 

When I was in the Netherlands this summer I visited an area called Oosterheem, in Zoetermeer. Like Fish Island and Sweetwater it is an area with new housing and is split in two by water. Below is a map showing the routes cars can take, in black, and those that people can take by bicycle or on foot in green (although both of the road crossings also have segregated cycle tracks and pavement)




These bridges provide routes for people to cycle or walk from their homes to visit local amenities, such as shops, schools or friends in the area but make it less appealing to do so by car 


They continue on as direct routes through the local area, completely separate from the road network



These are intersected by other routes creating a real network of cycle routes that are quick and essentially safe for anyone to use, no matter what their age.




Below shows the local school and nursery on the left, with another direct and continuous  cycle track past it that continues over the water in the distance. The roads do not and are only used as access roads so whilst everyone can drive to their destination it is much easier to travel around the area by bike or on foot


The residential roads are carefully arranged to ensure they are only used by motor traffic accessing those roads for a purpose, rat running is not possible and the roads are designed for low speed traffic.

These are the kind of implementations Sadiq Khan should be encouraging for Fish Island and Sweetwater if he is serious about cleaner air in London, not ripping out popular walking and cycling routes to create yet even more roads for rat running motor traffic in the Olympic Park.

Nobody except the London Legacy Development wants this bridge. Local residents do not want it 




Future residents of Fish Island and Sweetwater, if they have quiet roads and safe routes to cycle on, surely wouldn't ask for a new road bridge once they experience how pleasant it is to live in such an area. John Biggs, the Mayor of Tower Hamlets does not want his bridge. Rushanara Ali, the local MP, does not want this bridge. Sadiq Khan has the power to tell the LLDC to halt the construction of this bridge and he should do this to save Hackney Wick and Fish Island from more motor vehicles, more pollution and a worse quality of life.